Balfour Beatty, Cowlin – St Mary’s School, Swindon – for Cowlin Construction

We have recently secured the plastering package at St Marys School for main contractor Cowlins. The package consists of over 3500m2 of hardwall and skim with approximately 60% of this being to curved blockwork walls. Optimum will also install a number of perimeter boxings to the external walls and will be installing a gyptone ceiling to the sportshall.